Florida Gas Transmission Mainline Hydrostatic Test
Project Location


Click thumbnail to view a larger map

The section of the Florida Gas Transmission Company 18-inch diameter mainline that was tested in northern Miami-Dade County is 10.2-miles long. The pipeline generally follows the Palmetto Expressway (S.R. 826) between the Golden Glades Interchange and the interchange with NW 122nd Street.

The pipeline that was tested is located within:
  • City of Miami Gardens
  • Town of Miami Lakes
  • City of Hialeah
  • Unincorporated Miami-Dade County